Production & Port Facilities
Area 1 ERW/HFI (400 KMT/year)
  • X80
  • 180x180 - 500x500
  • 8 5/8’’ - 26’’
  • 4.78-25,4 mm
Area 2 HSAW (375 KMT/year)
  • X80
  • 24’’ - 100’’
  • 6-25,4 mm
Area 3 LSAW/JCOE (400 KMT/year)
  • X80 (X100 in the future)
  • 16’’ - 56’’
  • up to 40 mm
Area 4 ERW/HFI plant (150 KMT/year)
  • S355J2H
  • 2’’ - 7 5/8’’
  • 3,0 - 10,0 mm
Area 5 Port Facilities
Port facilities (exclusive use)
Area 6 Storage Areas
Storage areas
Area 7 & 8 Coating (2 mills)
  • 4 1/2’’ - 100’’
Area 9 Lining mill
  • 8 5/8’’ -  56’’
Area 10 Connectors Facilities
  • 5.000Tn/shift/year
Area 11 Laboratory
Area 12 Double jointing welding plant
The DJ facility is set up to join 40 ft. (12 m) DRL pipe joints into 80 ft. (24 m) “double-joints”
Area 13 Concrete weight coating facility (CWC)
Concrete weight coating facility (CWC) in cooperation with Wasco Energy.